Over the past week I have created too extensions to the group work project. The first change was to the elevator, which involved a complete re-design as the original was model on a more universal elevator as opposed to the intended disabled platform. The new platform now acts as a moving platform rather then a lift, meaning that no support beams or pulley systems are needed to lift the platform. The doors are now glass and swing open rather then open as conventional lift doors open. Both doors are fitted with a door open button, as well as a lift call button.

New disabled lift


The second addition to the project was the new stairs. These have been straightened out, re sized and had the walls around them built out. At this moment in time it is difficult to tell whether there are railing's either side or not but they may be placed into the project later.

New stairs for the new building